window installation Options
Very first, tape the bottom from the frame and afterwards up the edges. Produce a downward Lower in Each individual with the corners and then fold the tape above the WRB.Along with checking the window by measuring the diagonals, open and shut the sashes to be sure the tops and bottoms are parallel Using the sill and best jamb and the top and bottom